Jackhammering of New Walkway |
December 6, 2006 - The Rotary Centennial Walkway (West Buffalo Creek Walkway) along Westhill is being jackhammered up after being opened to the public about a month ago. Numerous deviations from city specifications and ADA requirements were noted to Alden Nellis in a report to the City Council, Mayor, City Manager, TXDOT and the Department of Interior on November 17. See that report here.
The concrete and rebar from the 220 foot long walkway is being dumped into Buffalo Creek. See a separate report.
During demolition, construction personnel and equipment damaged T posts and stretcher posts on private, posted property at 603 S. Walnut. A call to City Hall to report the damage netted no return phone call in two days..